# How Long Does Parking Lot Resurfacing Take in Jacksonville?
Parking lot resurfacing in Jacksonville typically takes between 2 to 7 days to complete, depending on several factors. The timeline can vary based on the size of the parking lot, current condition, weather conditions, and the specific resurfacing method being used.
## Factors That Affect Resurfacing Timelines
### Size of the Parking Lot
One of the most significant factors in determining how long a parking lot resurfacing project will take is the size of the area. Smaller lots, such as those for small businesses or strip malls, may only require 1-2 days for complete resurfacing. Larger commercial lots, like those found at shopping centers or office complexes, can take 4-7 days or more to complete.
### Condition of the Existing Surface
The current state of your parking lot plays a major role in the timeline. Lots with minimal damage might only need a simple overlay, which is faster to apply. However, lots with significant damage, deep cracks, or potholes will require more extensive preparation work. This preparation can include milling the existing surface or even complete removal and replacement in severely damaged sections.
### Weather Conditions in Jacksonville
Jacksonville weather can significantly impact resurfacing projects. Asphalt cannot be properly installed during rain or when temperatures drop below certain levels. During summer months, work can progress more quickly, but the intense Florida heat can also require workers to take more frequent breaks. Spring and fall are typically ideal seasons for parking lot resurfacing in Jacksonville, offering more consistent work conditions.
### Type of Resurfacing Method
Different resurfacing methods require different timeframes:
– Simple seal coating may only take 1-2 days and requires 24-48 hours to cure
– Overlay applications typically take 2-4 days plus curing time
– Complete removal and replacement can take 5-7 days or longer
– Phased approaches, where sections are completed sequentially, can extend the total timeline but keep portions of the lot usable
## Typical Resurfacing Process Timeline
### Day 1: Preparation
The first day typically involves cleaning the surface, marking utilities, and preparing the area. For more extensive resurfacing, milling or removing damaged asphalt begins on this day. This phase can take 1-2 days depending on the condition and size of the lot.
### Days 2-3: Repairs and Base Work
Any significant repairs to the base layer occur during this phase. This includes fixing drainage issues, repairing substantial cracks, and ensuring the base is properly graded. For smaller lots, this may be completed in a single day.
### Days 3-5: Asphalt Application
New asphalt is applied during this phase. For larger lots, this process may be split into sections. Weather conditions must be favorable during this critical phase.
### Final Day: Finishing Touches
The final day involves applying striping, parking space lines, handicap symbols, and other markings. Depending on the complexity of the layout, this can take 1-2 days to complete.
## Real World Example in Jacksonville
Recent resurfacing work at Kathryn Abbey Hanna Park demonstrated typical timelines for Jacksonville parking areas. The main visitor parking lot, which experiences heavy traffic year-round, underwent a complete resurfacing that took approximately 5 days. Despite the park’s continuous operation, our phased approach allowed visitors to maintain access throughout the process.
## Planning for a Parking Lot Resurfacing Project
When planning a parking lot resurfacing project in Jacksonville, it’s wise to add 1-2 extra days to your timeline to account for weather delays or unexpected issues. Communication with tenants, employees, or customers about the resurfacing schedule is essential to minimize disruption.
For optimal results and accurate timelines, working with an experienced local contractor is crucial. Bold City Seal & Asphalt Services specializes in parking lot resurfacing throughout Jacksonville and can provide you with a detailed timeline specific to your property’s needs. Our experienced team understands the local conditions and requirements that affect project duration. For a free assessment and timeline estimate for your parking lot resurfacing project, call us at (904) 907-9394.